Engage SHA1 IA64 assembler on IA64 platforms [from HEAD].
[oweals/openssl.git] / crypto / evp / e_des3.c
2004-12-09 cvs2svnThis commit was manufactured by cvs2svn to create branch
2004-12-05 cvs2svnThis commit was manufactured by cvs2svn to create branch
2004-11-30 cvs2svnThis commit was manufactured by cvs2svn to create branch
2004-11-25 cvs2svnThis commit was manufactured by cvs2svn to create branch
2004-05-11 Ben LauriePull FIPS back into stable.
2004-04-13 cvs2svnThis commit was manufactured by cvs2svn to create branch
2004-03-28 Dr. Stephen HensonEnhance EVP code to generate random symmetric keys...
2004-01-28 Richard Levitte0.9.7-stable is in freeze. That means we do bug fixes...
2004-01-28 Richard LevitteAdd the missing parts for DES CFB1 and CFB8.
2004-01-27 Andy PolyakovCFB DES sync-up with FIPS branch.
2004-01-27 Andy PolyakovCFB DES sync-up with FIPS branch.
2004-01-04 cvs2svnThis commit was manufactured by cvs2svn to create branch
2003-08-11 Richard LevitteA new branch for FIPS-related changes has been created...
2003-07-28 Ben LaurieAdd support for partial CFB modes, make tests work...
2003-07-27 Ben LaurieUnfinished FIPS stuff for review/improvement.
2003-03-20 Richard LevitteMake sure we get the definition of OPENSSL_NO_DES.
2002-02-16 Richard LevitteThe AES modes OFB and CFB are defined with 128 feedback...
2002-02-16 Richard LevitteThe AES modes OFB and CFB are defined with 128 feedback...
2002-02-13 cvs2svnThis commit was manufactured by cvs2svn to create branch
2001-10-24 Richard LevitteDue to an increasing number of clashes between modern...
2001-07-30 Ben LaurieReally add the EVP and all of the DES changes.
2001-07-21 Ben LaurieClean up EVP macros, rename DES EDE3 modes correctly...
2001-03-09 Dr. Stephen HensonChange the EVP_somecipher() and EVP_somedigest()
2001-02-19 Richard LevitteMake all configuration macros available for application...
2000-11-30 Richard LevitteFirst tentative impementation of Kerberos 5 cryptos...
2000-06-03 Ben LaurieEVP constification.
2000-05-30 Dr. Stephen HensonFourth phase EVP revision.